URGENT
URGENT
A Word From Our Sponsors
A Word From Our Sponsors
A Word From Our Sponsors
Back to Previous Page
What's New Page
Links to files and pages that have been recently added to the eaglelake1.org website sorted by order of most recent addition. This page is primarily intended for people that are returning to the website and are looking to see what has changed since their last visit.
File Date Modified
2018 Boat Launch Changes Page- Changes to the Eagle Lake boat launch as proposed in the 2018 Hammond Pond Unit Management Plan. As a second part of the proposed changes to the 2019 Hammond Pond UMP and its association with the Eagle Boat launch, additional stipulations and possible restrictions have been included; these stipulations relate to BOAT MOTOR SIZE, CARRYING CAPACITY, and a SITE SPECIFIC UMP.
May 26, 2019 at 5:48 pm
Eagle Lake Community News and Invasives Page- Various newspaper articles and publications that relate to news about the Eagle Lake community. Also includes articles that have focused on the plight of local lake associations and residents as they battle against invasive species and other lake issues. Most of the articles come from local area news publications in the Adirondack region.
May 26, 2019 at 9:36 am
1991- Lake residents survey for use of lake water results (when available)

06/15/1991- Lake residents survey form for use of lake water.

May 26, 2019 at 9:13 am
4-26-1986 letter- Concerning the location of the pin to determine the lake level.
May 26, 2019 at 9:13 am
1986 letters- collection of letters relating to the lake level and the reconstruction of the spillway dam.
May 26, 2019 at 9:13 am
01-20-2014 APIPP- The Actual and Potential Economic Impact of Invasive Species on the Adirondack Park
May 26, 2019 at 9:13 am
Lycott Update Spring 2011- Lake Fairlee, the next chapter in a continuing effort at lake management.
May 26, 2019 at 9:13 am
Roots Spring/Summer 2013-Volume 10; Invasive Plant News for the Adirondack Park, Adirondack Park Invasive Plant Program (APIPP).
May 26, 2019 at 9:13 am
Fall/Winter 2010 Roots- See page 2 for an article about the invasive European Oak borer.
May 26, 2019 at 9:13 am
Adirondack Park Invasive Plant Program (APIPP)- 2010 Annual Report for aquatic and terrestial work indicates that 80 lakes in the park have been identified with milfoil. This is 6 more than were know in 2009 and 53 more than in 2001 when formal surveys were started.
May 26, 2019 at 9:13 am
Winter 2011 Potamogetetons- Allied Biological newsletter (7mb file).
May 26, 2019 at 9:13 am
Eagle Lake Revisited- Tidonderoga Sentinal newspaper clippings from ~1920-1930 that pertain to Eagle Lake.
May 26, 2019 at 9:12 am
The Battle of Eagle Lake in the Year of '86- Poem related to Eagle Lake lake level issues.
May 26, 2019 at 9:12 am
5-6-2018 Compiled emails from May 1 to May 6, 2018- related to finding that emergency repairs made to causeway bridge supports could cause reduced boat access from one basin of lake to the other.
May 26, 2019 at 9:12 am
2019-1-23 Email request, by ELPOI President C. Hyde, to Eagle Lake residents- requesting to write letters about how proposed changes to boat Launch and Beach maintenance will affect their future use/ enjoyment of EL. Request includes names of DEC, APA and government contacts to direct comments to.
May 26, 2019 at 9:12 am
Eagle Lake Boat Launch Changes Email-Letter to membership describing the proposed changes to the DEC Eagle Lake boat launch and boat access only beach. January 2019.
May 26, 2019 at 9:12 am
3-16-2016 Letter to Ti Supervisor- requesting support for police enforcement of posted speed limit on NYS rt 74 along Eagle Lake.
May 26, 2019 at 9:12 am
4-27-2014 Adopt-A-Highway- Update on progress from Tonya Condon.
May 26, 2019 at 9:12 am
2-27-2014 Jeff Becker Stepping Down as Treasurer- Rolf Tiedemann (board member) is filling the position temporairily.
May 26, 2019 at 9:12 am
5-13-2013 Mulcahy Email- small forest fire on Eagle Lake from a downed power line.
May 26, 2019 at 9:12 am
3-25-2013 NYS DOT Response Letter- to 2012 Truck Rollover signage request from the Ti Supervisor.

9-9-2012 Letter to the Town of Ticonderoga- Traffic Hazard and Accident Prevention in Eagle Lake. ELPOI, Town, IP suggested response in regards to additional signage to mark a dangerous curve behind Fox Island.

May 26, 2019 at 9:12 am
6-2012- APA suggested herbicide monitoring guidelines.
May 26, 2019 at 9:12 am
Renovate Permit Survey REPLY- Towns of Ticonderoga and Crown Point 2011 survey responses to Eagle Lake residents questions regarding the future of milfoil project.

Renovate Permit Survey- Towns of Ticonderoga and Crown Point 2011 survey to assess Eagle Lake residents interest on future for milfoil project.

May 26, 2019 at 9:12 am
9-9-2010- Notes to Ticonderoga town board meeting for authorization to explore lead agent status.
May 26, 2019 at 9:12 am
3-2010- Attorney draft resolution communication to town supervisors for consideration for towns becoming lead agent.
May 26, 2019 at 9:12 am
12-15-2005 "Key Players" Dec, APA, Environmental Groups Meeting Agenda- Senator Betty Little along with the ELPOI milfoil coordinator Roll Tiedemann called a meeting to bring together the "key players" (state officials, lake managers, applicator Glen Sullivan, Allied Biological, lake residents, town officials,Adirondack Park community group leaders) to discuss the use of the herbicide SONAR for inclusion in the milfoil removal plan for Eagle Lake.
May 26, 2019 at 9:12 am
1-13-2002- Email communication with ELPOI membership regarding the recent decision about using sonar at Lake George including 3 related newspaper articles.
May 26, 2019 at 9:12 am
2001 ELPOI Communication with IRS- regarding determination letter issued in July of 1996 granted your organization exemption from federal income tax under section 501(c)(3) of the Internal Revenue Code.
May 26, 2019 at 9:12 am
9-5-2016 Board Meeting Minutes- In house water testing for Fecal, treasurers report, rt 74 speed limit, lake level, property map update, beavers, Charles Island camping and posting, boat launch sign updates, new invasive (flowering rush) found.
May 8, 2019 at 5:01 pm
6-30-2012 Board meeting minutes- Annual meeting & Picnic preparations, Board Size, Charitable organization contributions, Milfoil project status, IP Grant application, lake level, business membership money allocation.
May 8, 2019 at 4:52 pm
7-15-2012 Board Meeting minutes- Agenda for board meeting no further notes taken.
May 8, 2019 at 4:52 pm
2018 Causeway Replacment Survey and Results-survey of lake residents causeway reconstruction opinions and the survey results.
May 6, 2019 at 8:51 am
2019 Supporting Images for the Boat Launch and Beach Page- This is a collection of images by Rolf Tiedemann relating to the proposed changes to the beach and boat launch found in the Hammond Pond Unit Management Plan.
May 6, 2019 at 8:11 am
2019 Map Images for Boat Launch and Beach Page- Map Images for Boat Launch and Beach and ArcGIS 2018 Proposed State Land Classifications.
May 6, 2019 at 8:11 am
USGS Eagle Lake and Graphite Quadrangle Maps Page- 7.5 Minute topographic maps of Eagle Lake area 1973-present.
May 5, 2019 at 5:36 pm
2019-04-24 Beaver Trapping Permit 2019- April to December for spillway.
May 4, 2019 at 4:30 pm
Residents concerned about boat ramp- Eagle Lake launch to be modified under Hammond Pond plan. By Time Rowland Sun Times 1-10-2019.
Mar 24, 2019 at 11:39 am
2019 CSLAP Application and Volunteer Waivers- (This file contains personal information, please contact us for access.)
Feb 3, 2019 at 12:58 pm